Direct Fixing (suggested method)

Panels with horizontal matt black substrates are direct fixed to installed horizontal wall battens.

EB2WallsVBD_DirectFix0420

Plan section showing batten direct fixing

 

Black screws are used so that the black coloured screw head is hidden in the spacing between the battens.

EB2WallsVBD_DirectFixPlan0420

Split Batten Fixing

Panels with horizontal substrates are installed using split battens fixed to the back of the panel, interlocking with split battens fixed to vertical wall battens.

EB2WallsVBD_SplitBF0420

Plan section showing split batten fixing

downloadbutton

 

Direct Fixing (suggested method)

Panels with vertical matt black substrates are direct fixed to installed horizontal wall battens.

 

Plan section showing batten direct fixing

 

Black screws are used so that the black coloured screw head is hidden in the spacing between the battens.

Split Batten Fixing

Panels wtih small split batten blocks fixed to matt black substrates are installed to split battens fixed to vertical wall battens.

Plan section showing split batten fixing

downloadbutton

 

Direct Screw Fix to Grid – from below

Panels are secured by fixing from the underside, through the matt black substrate into the furring channel using black screws hidden in the spaces between the battens.

Plan section showing direct screw fix to grid – from below

Direct Screw Fix to Grid – from above

Panels are secured from above the grid, by screwing down through the furring channel into the back of the substrate crossmembers.

Plan section showing direct screw fix to grid – from above